• A new way of doing construction

    Integrated delivery. Performance targets.

  • Committed to results

    It’s in the contract!

  • High-performance buildings

    through deep energy retrofits.

Vignette video Ontario

HEALTHIER BOTTOM LINES

Going green to fight the healthcare cash crunch: innovative energy efficiency and renewable energy projects at three Ontario hospitals.

Vignette video Ontario

HEALTHIER BOTTOM LINES

Going green to fight the healthcare cash crunch: innovative energy efficiency and renewable energy projects at three Ontario hospitals.

Vignette video BIB

FLOURISHING TOGETHER

A 31% reduction in energy costs is enabling Beth Israel Brooklyn to further improve the patient care experience.

Vignette video BIB

FLOURISHING TOGETHER

A 31% reduction in energy costs is enabling Beth Israel Brooklyn to further improve the patient care experience.

Our Real-Time Project Results

cumulative savings ($)
avoided GHG (metric tons)

Work completed at Bronx-Lebanon Hospital

Modernization work begun at Bronx-Lebanon Hospital in 2013 has just been completed by our New York team.

Bronx-Lebanon

The 447,195 ft2 building with close to 1,000 beds now has three high-efficiency chillers to help ensure optimal comfort for patients and staff.

To house all this equipment (total capacity weighs in at 1,500 tons), Ecosystem needed to build a two-story mechanical room, a change to the building’s structure designed to be as unobtrusive as possible.

All work was carried out without affecting hospital operations—no mean feat considering most work was done during the hottest period of the year!